Renovation and Retrofitting of ESP, Stage-II (4x500 MW)
Talcher, Odhisa
NTPC Limited
Under Progress
Design, Manufacture, Supply, Erection, Commissioning and PG Test of the ESPs including:
- New parallel pass including internals and ducting,new structure and casing.
- EPIC III controllers, TR sets, cables and switchgears.
- Additional Control Rooms for Unit4, 5 & 6.
- Dry ash handling system for new pass and hook up with existing pass.
- EPIC III controllers of existing passes.
Post Retrofit /R & M Benefits
Stack emission levels to be reduced.
State of art EPIC III Controllers to be installed – Auxiliary power to be reduced.
Life extension of the ESP.